Files
Final-Year-Project/Backend/docs/release-checklist.md

1.4 KiB

Release Checklist (Phase 10)

Functional verification

  • Device registration and heartbeat flow works for both camera and client roles.
  • Camera-client linking and command dispatch/ack flows work end-to-end.
  • Motion start/end events are persisted and notify linked clients.
  • On-demand stream request/accept/end flow works with media credentials.
  • Recording placeholder creation, finalize, and download URL generation work.
  • Push fallback queue delivers notifications when realtime channel is offline.

Security and reliability

  • Rate limit thresholds validated in staging.
  • Audit logs capture stream/event/recording sensitive operations.
  • Env vars present: auth base URL, media provider, database, MinIO, secrets.
  • Worker loops running: recordings worker and push worker.

Observability

  • /ops/live and /ops/ready healthy.
  • /ops/metrics reports request counters and status counters.
  • Structured request logs are visible in deployment log sink.

Pre-release load and tests

  • Unit tests pass (bun test).
  • Smoke load script passes (bun run load:smoke).
  • Manual run with simulator in two tabs confirms camera+client happy path.

Rollout

  • Deploy to staging and run checklist above.
  • Rollout production gradually and watch error/status metrics.
  • Keep rollback procedure ready (previous image/version + migration compatibility).